Key Points

The goal of the design phase is to get as much as possible onto the estimate, so there are fewer change orders to run later.
Sharing your budget limit up front means our technical side and our designer know it from the design kickoff, so your selections line up with your budget.
If you ask for a change once building has started, we talk through how it affects your price and schedule, and we decide together.

Maybe you’re thinking, “Every remodel ends up with a pile of change orders, and the beginning price is never the end price.” This isn’t the case with us.

You’ll learn:

  • Where change orders come from once the design is agreed
  • Why it helps to share your budget limit up front
  • What is in the price you see at the end of design
  • What can turn up when the walls come open

Where Do Change Orders Come From Once the Design Is Agreed?

Once the design is agreed, change orders come from 2 places:

  • Conditions nobody could see before work started
  • Changes you ask for after the fact

If you ask for a change once building has started, we review the options with you and our designer, talk through how it affects your price and schedule, and decide together if we should do it.


Why Does It Help to Share My Budget Limit Up Front?

Designer working on a 3D kitchen design at a computer

Sharing your budget limit up front means the layout options you see at the design presentation are based on where your budget lands. The presentation is when the technical side of our team and our designer talk with you about expectations.


What Is in the Price I See at the End of Design?

Two designers reviewing plans and tile samples at a table

At the end of design, you get a hard cost, meaning the estimated price for the project we designed together. We develop your layouts, most selections, and construction details in the design phase, before final construction pricing. The goal is to get as much as possible onto the estimate so there are fewer change orders later.

To see how your layouts, selections, and construction details get settled before that price, read what happens during the design phase of a remodel.


What Can Turn Up When the Walls Come Open, and What Happens Then?

Once construction begins, we can find things behind a wall that nobody could see, such as:

  • Hidden water damage
  • Outdated plumbing or electrical systems
  • Framing that does not meet current code requirements

We talk concerns through at the start, and we course-correct when the walls come open.

On one bathroom remodeling project, we had some concern about the framing (the wood skeleton of the walls), so we talked about it at the very beginning. When we opened up the walls, the plan changed a little bit, and we course-corrected the way we always do, with our technical side and our design side keeping the homeowner’s vision in the plan.


Ready to Plan Your Remodel With Box Construction?

Our design-build process begins with your budget limit and your design, and the goal is to get as much as possible onto the estimate so there are fewer change orders later. We work with homeowners in Temecula, Murrieta, Menifee, and Fallbrook.

Fill out our contact form or give us a call to schedule a design consultation.

Frequently Asked Questions

Does design-build help keep a remodel on budget?

Planning design and construction together helps you make decisions earlier, line up your selections with your budget, and reduce costly surprises or changes during construction. With design-build, our designer and the technical side of our team work on the same project.

How does moving plumbing change a remodel?

Relocating plumbing may affect the scope of work, the permitting requirements, and your overall investment. As the design develops and before final pricing, we check whether the move can be built, whether it needs an engineer, what it will cost, and which materials take a long time to arrive (long-lead materials). The goal is to get it onto the estimate, so it’s less likely to become a change order later.

What is a change order?

A change order is a written change to the price or scope of work in your contract. In California, the contractor licensing board says any change to your contract's price or scope of work must be a written change order, signed by you and the contractor before the change is made, and it then becomes part of the contract.