Key Points

Outlet and low-voltage locations, gas lines, a pot filler if you want one, and the lighting wiring all have to be decided before construction starts.
With a lit glass-front cabinet, only the light inside has to be planned early. The glass door is easiest to decide before the cabinets are built or ordered, and it can still be swapped later.
Changes after construction starts can affect pricing, timelines, and scheduling.

Say your kitchen is half built, and you start thinking, “I wish there were an outlet inside that drawer.” Some details are easy to change at that point, and some aren’t. Our designer asks about the hard-to-change ones early, so you don’t get halfway through the project and realize you forgot something.

You’ll learn:

  • Which kitchen details have to be decided before construction starts, and which can wait
  • Why only the light inside a glass-front cabinet needs early planning
  • How the designer plans storage around the way you live
  • How the layout gets worked out before anything is built
  • What a finished kitchen with those details looks like
  • What gets harder to change once the work is underway

What Has to Be Decided Before Construction Starts?

Kitchen rendering with wood cabinets, a quartz backsplash, and an island with black stools

Once construction starts, you can’t really change some parts of the design without affecting the whole project. Those parts are where the mechanical, electrical, and plumbing lines run, which we call MEP, plus the structure.

In this rendering of one of our kitchens, the pop-up outlet on the island and the light over the sink are labeled. Those are the kinds of spots we decide early.

In a kitchen, what needs deciding early is:

  • Where the outlets and low-voltage wiring go (low-voltage wiring is the thin wiring that is separate from your regular outlets)
  • Where the gas lines go
  • A pot filler, if you want one, because we have to run the plumbing for it
  • Lighting, because its wiring is run inside the walls before the cabinets go in (we call this the rough-in)

Do Glass-Front Cabinets With Interior Lighting Need to Be Planned Early?

Dark wood glass-front upper cabinets with lights inside

Glass-front upper cabinets with glass shelves, like the ones in this home bar, have one part you decide early and one part that can wait.

The lights inside are the early part. If you want them, they get discussed up front, because their wiring is part of the rough-in.

The glass doors themselves are a different story. You don’t have to lock them down early. The easiest time to decide on them is before we get to cabinet building or ordering.

Even after that, it’s not too late. Say you’re halfway through the project and you decide you really want a glass-front cabinet. If the light inside was already discussed, a glass front is an easy fix. We take the door off the hinge and put on a new cabinet door or inset.


What Makes a Kitchen Design Feel Like It Was Made for You?

Every job is different, and a design should fit the people who live in the house.

Part of that is putting storage where it works for them. For example, our designer checks whether the low storage spots are convenient and workable for the people who use them most.

For more on making a design your own, see our guide to personalizing your remodel design.


How Does Planning Early Help Your Kitchen Work Better Day to Day?

How your kitchen works every day comes down to its layout, which we work out before construction starts. For us, the first thing that comes to mind is the kitchen work triangle: where your oven sits compared with your fridge and your sink. Our post on improving the kitchen work triangle goes more into it.

Beyond the triangle, we look for dead space, like corner cabinets and lazy Susans, and try to get rid of it.

Floor plan showing a kitchen with an island and a pantry next to the dining and living rooms

On a single-room remodel like a kitchen, the goal is for our designer to ask enough questions up front that we aren’t redoing the floor plan again and again. This floor plan, labeled Option 1, shows where the kitchen, island, and pantry sit within the first floor.


How Do We Plan Your Cabinets, Storage, and Lighting Together?

Our designer goes through your kitchen cabinet by cabinet. When she’s in your home, she opens your cabinets and drawers and looks at how things are set up now. Lighting is part of that planning too. Then she asks questions like:

  • How do you live, and how do you store your food?
  • Should the pantry have a pull-out?
  • Should a drawer have hidden outlets inside?
  • Where is your spice cabinet compared with where you cook?
  • If you host parties and have a lot of serving ware, is there room to store it?
Kitchen with a green stone waterfall island, wood cabinets, and open shelves

Our kitchen remodel in Murrieta has lower cabinet pull-outs, 2 appliance garages (cabinet sections that hide small appliances on the counter), and a large pantry with pull-outs. The island has outlets inside its drawers for cooking gadgets, and there are outlets in the drop zone to charge devices out of the way. The under-cabinet lighting there is also controlled from the homeowner’s smart devices and by voice, which we cover in our post on smart home remodeling.


What Gets Harder to Change Once Construction Starts?

Kitchen corner with glass-front upper cabinets and black countertops under a window

Electrical, gas, and plumbing work are harder to change once construction starts. They can need a permit, which we handle for you. In Murrieta, for example, the city requires a permit for most electrical, gas, mechanical, and plumbing work.

If you want to change a detail partway through, or something nobody could see turns up, like hidden water damage or framing that doesn’t meet current code, we go over the options with you and our designer, talk through what each one changes, and decide together.

Changes during construction can affect pricing, timelines, and scheduling.


Ready to Plan Your Kitchen With Box Construction?

If you’re planning a kitchen and want to know which details to decide first, take a look at our kitchen remodeling page. Then fill out our contact form or give us a call.

Frequently Asked Questions

Can I add glass-front cabinet doors after construction starts?

You can add them partway through, because swapping a cabinet door is an easy fix: we take the old door off the hinge and put on a new one. The light inside is the part to bring up with our designer early, since its wiring goes in before the cabinets do.

What does the designer look at when she comes to my home?

She looks at how your kitchen is set up now. She asks where your spice cabinet sits compared with where you cook, whether your low storage spots are convenient, and where you have dead space. She uses what she learns to plan your storage around how you live.

What happens if I change my mind about a detail during construction?

A finish item like a glass cabinet door is an easy swap, but a change to the plumbing, electrical, or structure touches the whole project. Either way, we go over the options with you and our designer and decide together.