Remodeling a whole house is a different job from remodeling one room, and it’s more than several rooms done at the same time.
We look at how your family lives and redesign the house around it.
You’ll learn:
- What a whole-home remodel can include, and how it differs from remodeling one room at a time
- How we plan the work, what order it happens in, and how long each stage takes
- How we keep the rooms working together, and how we manage the disruption
What Can a Whole-Home Remodel Include?
We treat the whole house as one project. Depending on your home, that can include the floor plan, the kitchen and bathrooms, flooring, cabinetry, lighting, plumbing and electrical, fireplaces, built-ins, and finishes.
Before we talk about finishes, we want to understand how your family moves through the home and what frustrates you about the current layout. In many cases, we can remove or change walls to let in more natural light and make it easier to see and move from room to room. During planning, we check the structure, with an engineer where needed, to confirm which walls can safely come out or move.
How Is a Whole-Home Project Different From Remodeling One Room at a Time?
When a house is remodeled one room at a time over several years, each project tends to solve the problem in front of it.
The kitchen is designed around the kitchen. Later, the primary bathroom gets its own design. Homeowners can end up paying to redo earlier work because an old decision doesn’t fit the next project.
We plan the whole house at once instead of kitchen first, then bathroom, then living room. We try to settle as many major decisions as possible before construction starts, especially the plumbing, electrical, and structural layout.
Plumbing, electrical, and HVAC work can run through several rooms, so we plan where that work runs through the whole house. That way, we make those decisions once and understand how they affect everything else.
How Do We Sequence the Work Across the Whole House?
As the design comes together, we’re also checking whether it can be built and tracking costs, permits, and any materials that take a long time to arrive.
That way, the plans, any permits, your selections, and what we need to order are coordinated before construction starts. A few smaller choices can wait until just before we order them.
We look at what has to happen behind the walls and across the house before we set the construction order.
Demolition, framing, and structural work generally come first, before the walls are closed up. Where the work has a permit, the City of Temecula requires an inspection before that work is covered up, so inspections happen before the walls close.
Then drywall, cabinetry, tile, flooring, countertops, finish carpentry, painting, and fixtures follow, each one after the work it depends on.
How Long Does a Whole-Home Remodel Take, From Planning to Final Walkthrough?

On a whole-home remodel, design can take 4 to 8 weeks, depending on the scope and how complex it is. Planning usually takes another 2 to 3 weeks after you approve the design.
We don’t rush design to get straight into construction. By the time we start building, we want every room planned out, so there are fewer costly surprises along the way.
The project moves through the same 4 steps we use on all our work: Discovery and Vision, Design and Planning, Construction and Execution, and Completion and Reveal. Larger remodels with structural changes or several living areas often take 5+ months from planning through the end of construction. The timeline depends on planning, permits, how long materials take to arrive, the scope, and how complex the project is. Permits (which we handle for you) can even take a few months.
The last stage covers the finishing details, quality checks, and final inspections. Then you do a final walkthrough with your project manager and designer, and we finish with a professional cleaning and your warranty paperwork.
How Do You Keep the Whole House Looking Like One Home?
We start with the finish that matters most to you, like the flooring, the tile, or a fireplace, and build the rest of the selections from there.
We don’t make every room match.
We blend colors, textures, and undertones so the rooms work with each other without looking the same. If your kitchen has a lot of stone, for example, we think about how the fireplace stone can go with it without matching it exactly or competing with it.
Your designer leads the selections with you, from how each room works to the colors and mood boards. She also stays involved during construction to make sure the job is built the way it was designed.
How Do We Handle the Disruption of a Multi-Month Project?

We manage the disruption in 3 main ways:
- Phasing the work: when the scope allows, we work in phases so your family can stay in part of the house.
- Steady contact: you hear from your project manager daily, your designer weekly, and your project coordinator throughout the project.
- Site prep and cleanup: we have solid processes for site prep, cleanliness, and dust. If you stay in the house, you’re still living in a construction zone, so some dust is normal.

On the above whole-home project, an Art Deco remodel in Temecula, our project manager built a schedule showing each stage of construction before work began. The homeowners could check it any time and stay updated through the whole project.
Ready to Plan Your Whole Home?
If you’re thinking about remodeling your whole house in Temecula, Murrieta, Menifee, or Fallbrook, reach out about whole home remodeling, and we’ll talk through what you want to change and how we’d plan it.